Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost
Applied Mathematics and Computation (2016) - Comments
doi: 10.1016/j.amc.2015.10.059  issn: 0096-3003 

Long Wan, Jinjiang Yuan, Lijun Wei